Page #5

INSTALLATION MANUAL

STEP 2: PAGE 3 OF 4

BOTTOM TRACK INSTALLATION

DIAGRAM 2.4
step2-3o4.gif (10681 bytes)

DIAGRAM 2.4

A polyurethane sealant should be used to seal bottom tracks to concrete (concrete is too porpous to use silicone)

DIAGRAM 2.5
step2-3o44.gif (10122 bytes)

DIAGRAM 2.5

Apply a large bead of sealant into the sealant reservoir of the bottom tracks (on under side).